The method

How we count.

A takeoff is only worth something if you can walk back to the drawing for every number in it. This page is what we measure, how we measure it, what we leave out, and how you check our work before you price from it.

What we measure

Real codes, real units.

Every line carries a CSI MasterFormat code, a description specific enough to order against, a quantity, a unit, and a location or scope reference. The codes below are the ones each trade uses, so the schedule speaks the same language as your estimate.

TradeCSI MasterFormat codesTypical units
Drywall & framing09 21 16 · 09 22 16 · 09 29 00 · 07 21 00SF, LF, EA
Electrical26 05 19 · 26 05 33 · 26 24 16 · 26 27 · 26 51 00EA, LF, SY
Concrete03 11 00 · 03 15 00 · 03 30 00 · 03 41 00 · 03 53 00CY, SF, LF, EA
Plumbing22 11 16 · 22 13 03 · 22 13 16 · 22 40 00 · 22 42 00 · 23 31 00EA, LF
HVAC23 08 33 · 23 09 33 · 23 55 00 · 23 73 00EA, LB, TON
Flooring09 65 00 · 09 65 13 · 09 68 13 · 09 96 23SF, SY, EA
Painting09 63 00 · 09 96 00SF, SY, EA
Lumber & framing06 10 00 · 06 11 00 · 06 12 00 · 06 16 00LF, BF, EA

Every line carries

  • A CSI MasterFormat code, so it drops into a cost code system rather than a generic description.
  • A description you can order against — not "gypsum board" but "5/8 in Type X gypsum board".
  • A unit your supplier recognises — SF, LF, EA, CY, LB or TON, matching how the material is priced and ordered.
  • A location reference, so you can split the scope by level, area or drawing zone.
  • A status — scheduled from the drawings, or flagged for verification.

What we leave out

  • Labor hours and equipment productivity.
  • Material pricing and markup. Those stay yours.
  • Code compliance, permit, or engineering review.
  • Structural analysis or a design opinion.
  • Site conditions — we are measuring drawings, not walking a site.
When the drawings are not clear

We flag it. We don't guess.

A confident wrong number is worse than an open question, because you cannot see the wrong number. So anything the drawings do not settle is marked, listed separately, and left for you to decide.

See 31 flagged lines in the sample
01 / ILLEGIBLE

A sheet we cannot read

Low-resolution exports, faded prints and scanned sheets that lose detail. We say which sheet, rather than measuring a guess off it.

02 / NO SCALE

Dimensions that cannot be scaled

When a plan has no scale bar, or the scale does not match the printed size, linear quantities cannot be derived. That line gets flagged.

03 / CONFLICT

Two details that disagree

A note that contradicts a plan, or two sheets that size the same assembly differently. We surface the conflict instead of picking a winner silently.

04 / SUBMITTAL

Quantities on a manufacturer's schedule

Panel schedules, equipment lists and submittals often govern the count. Where the count is not on the drawings, it waits for the submittal.

05 / REVISIONS

Which sheet set is this?

We confirm the sheet set number and revision date the takeoff covers, so no line is measured from a superseded sheet.

06 / SCOPE GAP

Something the drawings never cover

If a scope boundary is unclear, we name it in the scope notes before work starts, not in the schedule after you have priced from it.

What each tier includes

Same method, different eyes on it.

The counting method does not change between tiers. What changes is whether a second pass happens before the result reaches you.

Full pricing
One Trade

$49 fixed / project

  • AI-assisted quantity takeoff
  • One trade scope
  • Trade-based line items and practical units
  • Excel-ready output

Fixed price. No subscriptions, no surprises.

Start a One Trade takeoff
Multi-Trade

$149 fixed / project

  • Everything in One Trade
  • Multiple trades on one plan set
  • Grouped by trade, level, and location
  • Excel-ready output

Fixed price. No subscriptions, no surprises.

Start a Multi-Trade takeoff
Multi-Trade + Review

$249 fixed / project

  • Everything in Multi-Trade
  • Review by an estimating professional
  • Quantity, unit, and scope-alignment checks
  • Flagged details and clarifications reviewed

Fixed price. No subscriptions, no surprises.

Start a verified takeoff

You get a private job link the moment your plans are uploaded. You can watch it move, see the quantities appear, and read what was flagged — without chasing anyone for an update.

Check an existing job
How to check our work

Spend ten minutes before you price.

A schedule you cannot audit is worth very little. Here is the order that catches the most, fastest.

  1. 01

    Read the flagged lines first

    Those are the ones the drawings do not settle. Every flag says why — an unreadable sheet, a missing scale, a conflict, a submittal count, a revision. You decide whether to resolve it, price around it, or send it back.

  2. 02

    Spot-check where the drawings give numbers

    Anywhere a sheet states a dimension or a schedule count, the takeoff should match it. That is the fastest way to find a systematic error rather than a one-off.

  3. 03

    Check the units against how you buy

    A material ordered by the pallet, sheet, or linear foot should not land in your estimate as square feet. If the unit does not match the way the supplier prices it, the number will not price correctly.

  4. 04

    Check the scope split against yours

    Quantities group by level, area or drawing zone. Confirm that grouping lines up with how you split the work, because that is what lets one set of sheets serve more than one bid package.

  5. 05

    Send back anything that looks wrong

    Give us the CSI code, the sheet number and the quantity you measured. That goes back to the drawing set rather than to a memory of it, which is the only version worth acting on.

Your drawings

Private, and deleted.

Plans are commercially sensitive, so we treat them that way and we delete them on a schedule you can hold us to.

How they are handled

  • Uploaded over an encrypted connection and stored privately, in access-controlled storage.
  • Used only to produce your takeoff. They are not used for anything else.
  • Deleted 30 days after your job closes.
  • Or 90 days after submission if the job never closes.
  • Job records are kept for the same window so an invoice can be reconciled, then removed.

What we do not do

  • We do not train models on your drawings.
  • We do not sell, share or license your plans.
  • We do not send your job link to anyone else.
  • We do not publish client names, projects or results as marketing.
Questions

The ones we get asked.

What exactly is in a takeoff?

A measured count of materials and assemblies from your drawings. Every line carries a CSI MasterFormat code, a description specific enough to order against, a quantity, a unit, and a location or scope reference. No pricing, no labor rates, no markup.

Which CSI codes do you use?

The real CSI MasterFormat codes for each trade, so the schedule speaks the same language as your estimate. Drywall and framing uses 09 21 16, 09 22 16, 09 29 00 and 07 21 00. Electrical uses 26 05 19, 26 05 33, 26 24 16, 26 27 and 26 51 00. Concrete uses 03 11 00, 03 15 00, 03 30 00, 03 41 00 and 03 53 00. Plumbing uses 22 11 16, 22 13 03, 22 13 16, 22 40 00, 22 42 00 and 23 31 00. HVAC uses 23 08 33, 23 09 33, 23 55 00 and 23 73 00. Flooring uses 09 65 00, 09 65 13, 09 68 13 and 09 96 23. Painting uses 09 63 00 and 09 96 00. Lumber and framing uses 06 10 00, 06 11 00, 06 12 00 and 06 16 00.

What do you leave out?

Labor hours, equipment productivity, material pricing, markup, code compliance review, structural or engineering review, and site condition assessment. Those stay with you. A takeoff is the quantity half of a bid, not the whole bid.

What happens when the drawings are ambiguous?

The line is flagged rather than guessed. Unreadable sheets, missing scales, conflicting details and quantities the drawings do not settle are marked for verification and listed separately so you can see exactly where a person still has to look. You can see this in the downloadable sample, where 31 of 80 lines are flagged with the reason.

How do revisions and addenda work?

A re-issued sheet set is a new scope, not a patch. Tell us the sheet set number and revision date and we confirm which version the takeoff covers before work starts, so no line is measured from a superseded sheet.

How do I check your work before I price from it?

Start with the flagged lines, because those are the ones the drawings do not settle. Then spot-check the lines where the drawings give explicit dimensions, confirm the unit matches how the material is ordered, and check the location grouping lines up with your own scope split. If a quantity looks wrong, send the CSI code, the sheet number and the quantity you measured, and it goes back to the drawing set rather than to a memory of it.