A sheet we cannot read
Low-resolution exports, faded prints and scanned sheets that lose detail. We say which sheet, rather than measuring a guess off it.
A takeoff is only worth something if you can walk back to the drawing for every number in it. This page is what we measure, how we measure it, what we leave out, and how you check our work before you price from it.
Every line carries a CSI MasterFormat code, a description specific enough to order against, a quantity, a unit, and a location or scope reference. The codes below are the ones each trade uses, so the schedule speaks the same language as your estimate.
| Trade | CSI MasterFormat codes | Typical units |
|---|---|---|
| Drywall & framing | 09 21 16 · 09 22 16 · 09 29 00 · 07 21 00 | SF, LF, EA |
| Electrical | 26 05 19 · 26 05 33 · 26 24 16 · 26 27 · 26 51 00 | EA, LF, SY |
| Concrete | 03 11 00 · 03 15 00 · 03 30 00 · 03 41 00 · 03 53 00 | CY, SF, LF, EA |
| Plumbing | 22 11 16 · 22 13 03 · 22 13 16 · 22 40 00 · 22 42 00 · 23 31 00 | EA, LF |
| HVAC | 23 08 33 · 23 09 33 · 23 55 00 · 23 73 00 | EA, LB, TON |
| Flooring | 09 65 00 · 09 65 13 · 09 68 13 · 09 96 23 | SF, SY, EA |
| Painting | 09 63 00 · 09 96 00 | SF, SY, EA |
| Lumber & framing | 06 10 00 · 06 11 00 · 06 12 00 · 06 16 00 | LF, BF, EA |
A confident wrong number is worse than an open question, because you cannot see the wrong number. So anything the drawings do not settle is marked, listed separately, and left for you to decide.
Low-resolution exports, faded prints and scanned sheets that lose detail. We say which sheet, rather than measuring a guess off it.
When a plan has no scale bar, or the scale does not match the printed size, linear quantities cannot be derived. That line gets flagged.
A note that contradicts a plan, or two sheets that size the same assembly differently. We surface the conflict instead of picking a winner silently.
Panel schedules, equipment lists and submittals often govern the count. Where the count is not on the drawings, it waits for the submittal.
We confirm the sheet set number and revision date the takeoff covers, so no line is measured from a superseded sheet.
If a scope boundary is unclear, we name it in the scope notes before work starts, not in the schedule after you have priced from it.
The counting method does not change between tiers. What changes is whether a second pass happens before the result reaches you.
$49 fixed / project
Fixed price. No subscriptions, no surprises.
Start a One Trade takeoff$149 fixed / project
Fixed price. No subscriptions, no surprises.
Start a Multi-Trade takeoff$249 fixed / project
Fixed price. No subscriptions, no surprises.
Start a verified takeoffYou get a private job link the moment your plans are uploaded. You can watch it move, see the quantities appear, and read what was flagged — without chasing anyone for an update.
Check an existing jobA schedule you cannot audit is worth very little. Here is the order that catches the most, fastest.
Those are the ones the drawings do not settle. Every flag says why — an unreadable sheet, a missing scale, a conflict, a submittal count, a revision. You decide whether to resolve it, price around it, or send it back.
Anywhere a sheet states a dimension or a schedule count, the takeoff should match it. That is the fastest way to find a systematic error rather than a one-off.
A material ordered by the pallet, sheet, or linear foot should not land in your estimate as square feet. If the unit does not match the way the supplier prices it, the number will not price correctly.
Quantities group by level, area or drawing zone. Confirm that grouping lines up with how you split the work, because that is what lets one set of sheets serve more than one bid package.
Give us the CSI code, the sheet number and the quantity you measured. That goes back to the drawing set rather than to a memory of it, which is the only version worth acting on.
Plans are commercially sensitive, so we treat them that way and we delete them on a schedule you can hold us to.
A measured count of materials and assemblies from your drawings. Every line carries a CSI MasterFormat code, a description specific enough to order against, a quantity, a unit, and a location or scope reference. No pricing, no labor rates, no markup.
The real CSI MasterFormat codes for each trade, so the schedule speaks the same language as your estimate. Drywall and framing uses 09 21 16, 09 22 16, 09 29 00 and 07 21 00. Electrical uses 26 05 19, 26 05 33, 26 24 16, 26 27 and 26 51 00. Concrete uses 03 11 00, 03 15 00, 03 30 00, 03 41 00 and 03 53 00. Plumbing uses 22 11 16, 22 13 03, 22 13 16, 22 40 00, 22 42 00 and 23 31 00. HVAC uses 23 08 33, 23 09 33, 23 55 00 and 23 73 00. Flooring uses 09 65 00, 09 65 13, 09 68 13 and 09 96 23. Painting uses 09 63 00 and 09 96 00. Lumber and framing uses 06 10 00, 06 11 00, 06 12 00 and 06 16 00.
Labor hours, equipment productivity, material pricing, markup, code compliance review, structural or engineering review, and site condition assessment. Those stay with you. A takeoff is the quantity half of a bid, not the whole bid.
The line is flagged rather than guessed. Unreadable sheets, missing scales, conflicting details and quantities the drawings do not settle are marked for verification and listed separately so you can see exactly where a person still has to look. You can see this in the downloadable sample, where 31 of 80 lines are flagged with the reason.
A re-issued sheet set is a new scope, not a patch. Tell us the sheet set number and revision date and we confirm which version the takeoff covers before work starts, so no line is measured from a superseded sheet.
Start with the flagged lines, because those are the ones the drawings do not settle. Then spot-check the lines where the drawings give explicit dimensions, confirm the unit matches how the material is ordered, and check the location grouping lines up with your own scope split. If a quantity looks wrong, send the CSI code, the sheet number and the quantity you measured, and it goes back to the drawing set rather than to a memory of it.
Same method, same codes, same flagging discipline — scoped to the trade you are bidding and the plans you actually have.