Lumber & framing takeoffs

Framing lumber, sheathing, and hardware, by floor.

Send your lumber & framing plans. Get a CSI-coded, Excel-ready quantity schedule — measured from the drawings, with ambiguities flagged for review.

Vector PDF or DWG only · 6 measured item types · Fixed pricing below

At a glance

What’s included in lumber & framing.

  • Wall studs by length and gradeEA / LF
  • Floor and ceiling joistsEA / LF
  • Rafters and roof framingEA / LF
  • Beams, headers, and postsEA / LF
  • Sheathing by areaSF / sheet
  • Connectors and hardwareEA
Simple, project-based pricing

Fixed per project. No subscription.

Pick the tier that fits this plan set. Lumber & framing can be scoped as one trade or included in a multi-trade schedule.

One Trade
$49fixed / project

One trade on this plan set, with a clear, Excel-ready quantity schedule.

  • AI-assisted quantity takeoff
  • CSI-coded line items and units
  • Ambiguities flagged for review
Choose One Trade

No surprises.

Multi-Trade + Review
$249fixed / project

Multi-trade takeoff plus review by an estimating professional.

  • Everything in Multi-Trade
  • Quantity, unit, scope checks
  • Flagged details reviewed
Choose Multi-Trade + Review

No surprises.

All prices in USD. Fixed per project — no per-seat licences, no custom quotes. See a real schedule.

Common misses

Handled or flagged.

  • Trusses and rafters counted twice: A roof built with trusses has no separate rafter framing, but the plan can still show rafter lines for reference. Counting both inflates the bid. We identify the roof system first and count only what the framing plan says is built.
  • Sheathing area with openings not netted: Sheathing is sold in sheets, so openings change the number of sheets as well as the area. Where openings are dimensioned, we net them out and calculate the sheet count from the net area.
  • Hardware missing from the lumber bid: Hangers, straps, and hold-downs are often listed in the connection details, not on the framing plan. A lumber order that leaves them out will be short when the crew reaches the connection. We pull them from the detail sheets.
FAQ

Quick answers.

Do you order by floor?
Yes. The schedule is grouped by floor and assembly, so each floor's framing can be ordered and staged. Roof framing is shown as its own group.
Can you measure a truss roof?
Yes. The roof is identified as trusses, and the truss count is taken from the roof framing plan. Rafter lines that are only shown for reference are not counted as separate members.
Do you include connectors and fasteners?
Connectors are counted from the connection details and the framing schedule. Fasteners are listed where the specification gives a count or a rate; otherwise they are flagged.
Does this check the structural design?
No. The schedule measures what the framing drawings show. Member sizing and structural design stay with the engineer of record, and we flag any member whose size conflicts with a schedule.
Ready when you are

Send lumber & framing plans.

Upload vector PDF or DWG files. We’ll confirm scope before you pay for review. See pricing.

Send lumber & framing plans